ABOUT US
PWR AMERICA
Maximum Solar Production.
Pwr America’s Titan Silfab 370 solar panels are designed to be highly efficient, delivering maximum solar production year-round, even on
roofs with complicated angles. Powered by SolarEdge Inverter your fully integrated system is safe and reliable.
READ MOREDESIGN
TITAN WILL FINALIZE YOUR design plans. ONCE COMPLETED, PLANS will be submitted by Titan to YOUR local city government Authority Having Jurisdiction (AHJ) for permitting. Permit approvals are subject to schedule of the AHJ.
INSTALLATION
After permit approval, Titan will contact the property owner to schedule installation. When Titan’s install team arrives, they will go over the design plans for final approval before they begin. Once the Titan installation crew wraps up the job, they’ll finish by giving the property owner a full Solar 101 on the system. Depending on the size of property and system, this phase takes 1 to 5 days.
PERMISSION TO OPERATE
Two things that need to happen before the system can produce electricity. First, Titan will submit the documents to the utility company to connect to the grid. This usually takes 1 to 2 weeks. Second, the utility company has to install a new meter to track how much energy your solar produces. Once this has been completed, your utility will grant PTO (Permission to Operate) which means your system can be turned on. Titan will have little control over how long this step is going to take!